PAITON II POWER STATION - GaKKerjaID

Vacant Job Information

PAITON II POWER STATION

PT. YTL JAWA TIMUR
PAITON II POWER STATION

Under Indonesia's private power programme, PT. YTL Jawa Timur operates
and maintains this 2x610 MW Coal-fired Power Station. The station is
located at Paiton, Probolinggo District of East Java, 141 km Southeast
of Surabaya.

We currently have vacancy for:


ENGINEERING TECHNICIAN - ELECTRICAL – C & I Post Date: 07 May 07
You will be responsible to maintenance and repair of electrical and
power electronic equipment & system at Auxiliary Plant.

Candidate for this position should possess :


1. Minimum Diploma 3 years (D3) in Electronic, Engineering Physics
or Electrical Engineering from a reputable local University.

2. Having 3 years minimum similar maintenance experience in heavy
industries or power plant.

3. Good skill in instrumentation, control and automation system
troubleshooting.

4. Having good knowledge in control, instrumentation and automation
equipment and familiar with well know brand of PLCs and its Man
Machine Interfaces.

5. Having sound knowledge in electrical and power electronic
equipment, i.e inverter, converter, rectifier, and variable speed
drives will be preferable.

6. Good written and spoken English.

Remuneration and benefits will be comparable with the best in this
industrial sector.
Please submit a fully detailed CV in English, within 6 days of this
publication to:

PT. YTL JAWA TIMUR
Tromol Pos No 36
Paiton - Probolinggo, Jawa Timur 67291

or email to : recruitment@ytljt.com

0 comments

Subscribe to Our Newsletter